Our Portfolio & Case Studies
Explore our track record of successful HMO conversions, commercial-to-residential developments, and BRRRR projects across the UK. We pride ourselves on transparency and high-yield returns.
Manchester 6-Bed HMO
ROI
28%
Timeline
6 Months
Liverpool Terrace Flip
Uplift
£45,000
Timeline
4 Months
Leeds City Apartments
GDV
£1.2M
Timeline
18 Months
Sheffield Student HMO
Yield
12%
Timeline
3 Months
Nottingham Flip
Profit
£32,000
Timeline
5 Months
Birmingham Lofts
Units
12 Apts
Timeline
24 Months
The Victorian Terrace Transformation
We took a dilapidated 3-bedroom terrace in a high-demand area of Bristol and converted it into a high-spec 6-bedroom All-Ensuite HMO for young professionals. This project showcases our ability to maximize space through loft conversions and rear extensions.
What We Did:
- check_circle Full back-to-brick renovation and rewiring.
- check_circle Added L-shaped dormer loft conversion (2 beds).
- check_circle 3-meter single storey rear extension for communal space.
- check_circle Installed acoustic insulation exceeding regulations.
Lessons Learned
Every project teaches us something. Here is what we took away from this build to improve our future developments.
Planning Delays
The L-shaped dormer required a specific lawful development certificate which added 3 weeks. We now apply for this concurrently with other permissions.
Structural Steels
Access for the rear extension steels was tight. We now factor in crane hire costs for terraced properties with limited rear access.